EB13 Ultra-thin Safety Light Curtain

Brand: ESPE

Model: EB13 Series

Product Feature:

1. Price range: $61-$681/set (Inquire to get latest price, goods can be finished within 2-3 working days.);

2. Self-inspection in whole process, excellent vibration resistance and performance stability;

3. Easy to align with optical axis, strong to fight against optical or electromagnetic interference;

4. Low power consumption design, short response time and high reliability.

 

 

Product Details

Parameter of safety light curtain

Power supply DC10V~30V
Capacity <5W
Beam space 10mm, 20mm, 40mm
Resolution 15mm, 25mm, 45mm
Beams 10mm beam space:8, 12, 16……12820mm beam space:4, 6, 8, 10……6440mm beam space:4, 6, 8, 10……32
Protective height Protective height =(N-1)*beam space,N is beam quantity
Wave length 940nm
Response time Response time =(N* 0.1ms) + 0.4ms(N is beam quantity)
Type of output (OSSD) PNP/ NPN semiconductors, current< 200mA, residual voltage: 1 V max, (Expect voltage influenced by lengthen wire), leakage current: 1 mA max.
Protective circuit Over voltage protection, power supply reverse polarity protection, over current
Sensing distance 0.1~0.5m、0.1~1m、0.1~2m(remark: if have light reflection, please let us know)
Anti-optical interference 10000Lux(angle >5°)
Sensing method Through-beam type
Synchronization Wire synchronization
Enclosure material Aluminum alloy
Enclosure rating IP54
Housing cross-section 28*13mm
Vibration resistance 10Hz~55Hz,amplitude0.35±0.05mm,20 times each in X、Y、Z direction
Ambient operating temperature -10℃-55℃ (without freezing)
Storage temperature -30℃~70℃ (without freezing)
Ambient operating humidity When temperature is 20℃,humidity max 85%

 

 

Wire Connection

 

 

Explanation of Model Number

 

 

Product Size

 

A: Upper and bottom cover

B1: Upper stop-work range

B2: Bottom stop-work range

D: Beam space

H: Protective height

L: Total height

A=12mm;

When D=10mm,B1=5mm;B2=5mm

When D=20mm,B1=10mm;B2=10mm

When D=40mm,B1=10mm;B2=30mm

H is protective height:H=(beams-1)* beam space

L is total height: L=A1+A2+B1+B2+H

 

 

Option for Brackets

Installation picture Bracket Name Brackets Size
End cap with hole for mounting